ANALISA JENIS KERUSAKAN JALAN BESERTA PENANGANANNYA DI RUAS JALAN SIBANG-ANGANTAKA
Abstract
The condition of the Sibang-Angantaka road section has suffered extensive damage, including alligator cracking, potholes, and striping, as well as heavy vehicle traffic, making the road difficult to pass and increasing travel time. To address these issues, a PCI analysis is needed to determine the causes of damage on the Sibang-Angantaka road section. The Pavement Condition Index (PCI) is an estimate of road condition using a rating system to indicate the actual condition of the pavement based on reliable and objective data. The results indicate that the PCI values for the three segments are 0, 0, and 10, respectively, indicating the need for repairs. The proposed solution involves using AIC-BC (Asphalt Concrete Base Course) and AIC-WC (Asphalt Concrete Wear Course) pavement materials, with a total cost of Rp. 7,126,317,431.
Keywords: Road Damage Analysis, Pavement Condition Index, Road Damage Handling