EVALUASI PEKERJAAN ATAP TERHADAP WAKTU DAN BIAYA PADA PROYEK PEMBANGUNAN MC DONALD VILLA

Authors

  • I Gede Bayu Pratama Putra Jurusan Teknik Sipil, Politeknik Negeri Bali
  • Kadek Adi Suryawan Jurusan Teknik Sipil, Politeknik Negeri Bali
  • I Made Wahyu Pramana Jurusan Teknik Sipil, Politeknik Negeri Bali

Abstract

Indonesia as a developing country generally carries out various processes of change, one of which is development efforts. This can be seen from the many construction projects in Indonesia that are currently being carried out or planned. Roof frame construction is a form of construction that functions to support the roof which is located on trusses. Roofing work evaluation aims to assess the level of productivity, efficiency and effectiveness in construction projects. The results of roofing work evaluations can be used to adjust and develop project management strategies, such as calculating time, costs and required resources. This research was conducted with a descriptive design and quantitative survey. Quantitative surveys are a collection of primary data and ask questions to individual or group respondents to collect data that will be processed in this research. Work on time and costs for bituminous roof work on Mc Donald Villa with an area of 100 m2, namely: work on implementation time requires 7 working days, while work on implementation costs requires a cost of Rp18.630.000,00. The time required for bitumen roofing work on Mc Donald Villa is: a. Steel Frame Work WF 150.75.5.7 mm for 5 days b. CNP 100.50 mm Purlin Steel Work for 7 days c. 120 mm Plywood Multiplex Work for 8 days d. Bitumen Roof Work 1000 x 333 x 30 mm for 8 days So the total time for carrying out the work is 26 working days. The labor costs required for the roof construction work on the Mc Donald Villa construction project with an area of 100 m2 cost Rp. 18.630.000.00.

Published

2024-12-30