ANALISIS PERBANDINGAN PERANCAH BAMBU DAN SCAFFOLDING UNTUK PEKERJAAN STRUKTUR BETON BERTULANG PADA PROYEK SMKN 7 DENPASAR
Abstract
One of the fundamental differences between conventional and unconventional methods is the use of concrete scaffolding. The conventional method uses bamboo and the non-conventional method uses manufactured steel (scaffolding). With this difference, of course, the overall project financing will be different. With the above reasons, the thought arose to compare the cost of using bamboo scaffolding, and scaffolding in reinforced concrete work. To compare the two methods, a literature study was conducted from various existing reference sources, collecting image/document data in the form of USB (New School Unit) construction drawings of SMKN 7 Denpasar, namely plan situation drawings, views, cuttings, plan drawings, and unit prices of materials and wages applicable in Denpasar Regency. Analysis and discussion by making an implementation budget plan for both bamboo scaffolding work, usuk scaffolding and scaffolding scaffolding, namely calculating the analysis of the unit price of work and the total cost of all work. The results of the discussion show that bamboo scaffolding has a total cost of Rp. 48,314,740, and scaffolding has a total cost of Rp. 74,238,000. Reinforced concrete work is in accordance with the time schedule so that usage does not exceed the rental limit for 1 month.