ANALISIS WASTE MATERIAL PADA PROYEK PEMBANGUNAN GEDUNG LT.II SD NEGERI 17 PEMECUTAN
Keywords:
waste, materialAbstract
The increasing demand for infrastructure development requires efficient planning and management, particularly in the use of materials. Project materials significantly impact both the cost and success of a project. However, waste material often arises due to damaged materials or worker negligence, leading to losses and construction waste. To address this issue, large-scale projects need to implement a Waste Management Plan and effective material management to ensure accuracy in timing, quantity, and costs during construction. This study is conducted using a quantitative descriptive analysis method. Dominant waste materials in the construction project of SD Negeri 17 Pemecutan include D16 steel, Gresik cement, concrete blocks, M6 wire mesh, M8 wire mesh, sand for mortar, D13 steel, concrete sand, fill sand, and 40x40cm smooth ceramic tiles. Waste material is a common occurrence in every construction project; however, waste that is detrimental to the contractor can be minimized through optimal material supervision and control. Future research is recommended to cover a broader scope of work to provide a more comprehensive study and consider factors not addressed in this research.