ANALISIS BIAYA WASTE MATERIAL BESI BETON PADA PROYEK APARTEMEN KIARA OCEAN PLACE CANGGU
Keywords:
structural works, masonry works, ferrous materials, scrap materials, costAbstract
Residual material is an excess/excess quantity of material used or imported, but it does not add any value to a job, which means that the rest of the material does not really have an impact on a job but more impact on other things (cost). Iron material is the material with the largest waste value waste value compared to other materials such as ceramics, cement, ready-mixed concrete, piles, sand, sand, and other materials. mix, piles, sand, bricks, crushed stone. This study aims to determine the amount of residual costs material that occurs. This research uses descriptive-analytical method and using the bar bending schedule method based on working drawings Kiara Ocean Place Apartment Project Canggu Apartment Project. Furthermore, this research discusses all the remaining rebar material used in the project and takes into account optimization of the project and takes into account the optimization optimization of the use of the remaining iron material to be used in other concreting work. From the analysis obtained the results of the remaining iron material, which is at 2.97% or 19,605.70 kg with a cost loss of Rp. 274,479,842.30, - to the the total project value of Rp. 81,000,000,000.00, -.