ANALISIS PRODUKTIVITAS PEKERJAAN DINDING PADA PROYEK VILLA AQUAMARINE DI CANGGU, KAB. BADUNG-BALI
Keywords:
Productivity, Coefficient, AHSPAbstract
The productivity of construction projects is fundamental in influencing the performance of competitive ability in the construction industry. To find out the performance of the workforce can be measured by the productivity of the workforce. Lack of productivity on wall work can affect the impact of problems on the progress of the work in terms of time and cost. Therefore, a study was conducted to analyze worker productivity on wall work. For this research, productivity data will be sought in terms of time and costs incurred in realization. The aim of this research is to find out the comparison of actual data with planned data so that contractors will know where the differences in data are in the Aquamarine Villa project in Canggu, Kab. Badung-Bali. The method used for this research is direct observation/observation to find volume, number of workers, amount of materials, and observation time. So the results of the realized coefficient values for light brick wall work are obtained, such as foreman = 0.031 OH, head craftsman = 0.031 OH, craftsman = 0.186 OH, and worker = 0.279 OH. Meanwhile, the plan (AHSP) is foreman = 0.04 OH, head craftsman = 0.04 OH, craftsman = 0.18, and worker = 0.14 OH. So, when comparing the realization with the plan, the result data is obtained, where in terms of time the wall work was delayed by 77 days, whereas in terms of costs for the light brick wall work the planned value was higher at IDR 81,427,333.66, while for the plastering and plastering wall work the value was obtained. the realization was higher than the plan, resulting in a loss of Rp. 51,653,697.1