Abstract In the construction industry, an important factor that can influence the ability to compete is one's own productivity. Can save time and costs by increasing work productivity. However, due to different environmental and labor conditions in construction projects, there are several components that can affect work productivity. The aim of this research is to evaluate the quality of workers in installing lightweight brick walls to meet the desired standards and meet long-term project needs. Observation or direct observation of objects in the field is the expected way to carry out this research. Based on research carried out, calculations show that the average labor productivity value is 31,599 m2/day for foremen, 22,185 m2/day for head craftsmen, 19,834 m2/day for craftsmen, and 12,379 m2/day for workers, with the labor coefficient 0.033, 0.023, 0.054, and 0.083, respectively. Comparison of the costs of installing light brick walls, PUPR Ministerial Regulation 08-2023 with observations in the field, resulted in the Total Price of PUPR 08-2023: Rp. 10,943,207. 69. Total Analysis Price in the field: Rp. 9,023,315.64. Difference: Rp. 1,919,892.04. (One Million, Nine Hundred and Nineteen Thousand, Eight Hundred and Ninety Two. Zero Four Rupiah) Percentage Difference: 18%.

Published

2024-12-30