ANALISIS PENGARUH DAN PENYEBAB CONTRACT CHANGE OREDER (CCO) TERHADAP WAKTU PELAKSANAAN PADA PROYEK PEMBANGUNAN GEDUNG KANTOR (DPMPTSP, DISNAKER, DISKES, DAN CAPIL) KABUPATEN GIANYAR
Keywords:
Contract Change Order, Time, CostAbstract
In The implementation of building construction projects often involves discrepancies between the actual conditions on site and the planned results, leading to the issuance of change orders or CCO (Contract Change Order). The occurrence of CCO in construction projects impacts both the time and cost of project implementation. This research aims to analyze the extent of the impact of Contract Change Order (CCO) on contract value and project duration, and to identify the factors causing Contract Change Order (CCO). The research method used combines both qualitative and quantitative data (mixed methods). The analysis results show that Contract Change Order (CCO) in phases I and II did not alter the contract value. However, CCO in phase III changed the contract value from IDR 70,231,000,000.00 to IDR 72,054,210,000.00, representing a 2.60% increase.The project duration remains unchanged at 30 weeks or 210 days despite the Contract Change Order (CCO). The factors causing Contract Change Order (CCO) include additions and reductions in the scope of work items, discrepancies between drawings and actual site conditions, the addition of new work items, and changes in building design.