ANALISIS VARIATION ORDER (VO) PEKERJAAN STRUKTUR LANTAI ATAP PADA PROYEK PEMBANGUNAN GEDUNG MAL PELAYANAN PUBLIK GIANYAR

Authors

  • Ni Nengah Anggreni Rahayuni Politeknik Negeri Bali
  • I Nyoman Anom Purwa Winaya Politeknik Negeri Bali
  • I Komang Sudiarta Politeknik Negeri Bali

Keywords:

Construction Project, Variation Order, Contract Change Order, project value, construction management

Abstract

Construction project implementation is a limited activity with resource allocation to produce products according to specified quality specifications. Changes during the contract period can be caused by various parties involved in the project, affecting the cost and schedule of project implementation. An agreement between the project owner and the contractor is required to avoid
disputes. Variation Order work, including in the Gianyar Public Service Mall Building Project, affects the contract with additional work in the form of additions and subtractions of work items. The volume of work on the roof floor structure has changed with the addition of concrete, iron, and reduction of formwork. The cost of the Variation Order work reached Rp243.569.609,60, or 11% of the initial contract value. Although it did not cause delays, this work had critical work items such as Beams B3, B4, B5, B8, B7, B9, B10, and Beams RB. The contractor was able to overcome the critical activities with additional overtime hours and labor to complete the work on time. The total volume of concrete, iron, and formwork underwent significant changes in the roof floor structure work, and the cost of Variation Order work was quite large. However, this work did not result in any delay to the project.