ANALISIS KINERJA PROYEK PEMBANGUNAN TERINTEGRASI RANCANG BANGUN RUMAH SAKIT INTERNASIONAL BALI, DENPASAR

Authors

  • Anak Agung Bagus Wycan Dwijaya Politeknik Negeri Bali
  • Made Sudiarsa Politeknik Negeri Bali
  • Kadek Adi Parthama Politeknik Negeri Bali

Keywords:

design and build, project performance, hospital building

Abstract

The design and build system offers an alternative compared with the traditional bid-build system, the design and build providing advantages in accelerating construction and improving procurement efficiency because the planning & the cosntruction running simultaneously. This study focuses on the Bali International Hospital Project in Denpasar, analyzing its performance within a designbuild framework. While this system often outperforms traditional methods, it also encounters challenges that can hinder project optimization. this performance analysis is essential to understand the project's outcomes and identify factors affecting its success. Performance project was evaluated through questionnaire surveys namely in three phases the design, construction, and overall project phases. furthermore The Scoreing method was applied to categorize performance result levels, followed by interviews with key project stakeholders to identify underlying issues. The study utilized Fault Tree Analysis (FTA) and the Method for Obtaining Cut Set (MOCUS) to examine indicators that received poor ratings. Results revealed that the design phase of the Bali International Hospital project achieved a "fair" rating. However, the overall project performance received a lower score compared to the design and construction phases, with ratings of 3.19 (poor), 3.60 (fair), and 3.69 (fair), respectively.

Published

2024-12-30