ANALISIS CONTRACT CHANGE ORDER TERHADAP PERUBAHAN BIAYA DAN WAKTU PROYEK PEMBANGUNAN VILLA X2 BERAWA

Authors

  • I Kadek Bagus Sentana Prayoga Politeknik Negeri Bali
  • I Wayan Darya Suparta Politeknik Negeri Bali
  • I Wayan Sujahtra Politeknik Negeri Bali

Keywords:

Contract Change Order, Construction Project, Cost Change, Time Change

Abstract

Changes in work can be in the form of additions, reductions, or even replacement of the scope of work that has been mutually agreed upon in the initial contract. The changes are poured into the Contract Change Order (CCO). Contract Change Order. A contract change order (CCO) is a written agreement to amend a contract document that contains modifications, additions, or other alternatives to the work. The factor that causes the occurrence of contract change orders is the construction factor where the inconsistency of the planning volume with the realization in the field is the main cause. The impact of the contract change order was a change in the project budget which increased by Rp. 373,615,000 and the delay in the completion time of the project which was initially expected to be completed in 270 days to 390 days.

Published

2024-12-30