ANALISIS PENGARUH CONTRACT CHANGE ORDER TERHADAP BIAYA DAN WAKTU

Authors

  • Dewi Awaliyah Fitri Politeknik Negeri Bali
  • Wayan Darya Suparta Politeknik Negeri Bali
  • Wayan Sujahtra Politeknik Negeri Bali

Keywords:

Project, Construction, Change Order, Cost, Time

Abstract

Contract Change Order (CCO) in a construction project is an event that results in modifications both in the scope of work, implementation time and cost. According to data from the Public Works Office of the Buleleng Regency Government, the construction work of buildings that occurred in 2022 amounted to six, where of the six projects experienced CCO. This research was conducted using quantitative descriptive analysis. The results of the study show that the factors that cause CCO in the construction project of the Faculty of Medicine Lecture Building of Ganesha Education University are adjusting the needs that become the standard at Ganesha Education University, adjusting the minimum system improvement that must be met, adjusting the owner's request for work improvement, adjusting to the plan drawings, which were previously not included in the offer, adjusting to the availability of materials in the market and adjust existing conditions. As a result, there is a change in costs by 10% of the contract value. However, the change in work or CCO does not cause a change in time, either additional or reduced implementation time.

Published

2024-12-30