ANALISIS PERBANDINGAN UPAH TENAGA KERJA HARIAN DENGAN BORONGAN BERDASARKAN RENCANA ANGGARAN BIAYA (RAB) PADA PROYEK PEMBANGUNAN UNIT SEKOLAH BARU SMAN 12 DENPASAR
Keywords:
Cost Budget Plan, Daily Wage, Wholesale WageAbstract
There are several types of wages in construction projects, namely providing wages on a daily basis. There are also wages in bulk. Contractors must be careful in providing wages to workers, so that the work is in accordance with time, in accordance with what is planned and profitable. Therefore, a comparison of the cost of work for the construction project of the new school unit of SMAN 12 Denpasar, Jl. Imam Bonjol, Pemecutan Kelod Village, West Denpasar, Bali was made. Between the Survey RAB on a daily wage basis and wholesale based on the RAB Plan. Analysis of cost calculation in the New School Unit Construction Project of SMAN 12 Denpasar, between the value of the Planned RAB and the RAB results of the Daily Wage Method survey, the cost of using the Daily Wage Method is more economical compared to the Wholesale RAB of Rp. 1,377,000 or 0.7%