ANALISIS METODE PELAKSANAAN PEKERJAAN PONDASI BORE PILE TERHADAP BIAYA PELAKSANAAN PADA PROYEK PEMBANGUNAN GEDUNG DIKLAT RSUD BALI MANDARA
Keywords:
Construction method, Hydraulic Rotary Drilling, Construction costsAbstract
Construction method is a planning process that provides an overview of how to carry out a job, both in general and for each activity. The Bali Mandara Hospital Training Building is located within the hospital area, with soil conditions that have a high- water content due to the river situated directly in front of the building. Therefore, the selection of alternative construction methods must be reliable while maintaining the quality of the foundation to ensure it can be executed effectively and efficiently, which will also impact the construction costs. The purpose and benefit of this study are to determine the bore pile construction method and its associated costs considering the specific conditions of Bali Mandara Hospital. The research design used in this study is quantitative analysis with a descriptive approach, utilizing observation and interview methods. The discussion in this study includes the analysis of the construction method and the cost calculation for the bore pile foundation work based on field survey prices. The result of the construction method analysis indicates that the dry drilling method is used, employing a Hydraulic Rotary Drilling tool. The total cost incurred for completing the entire bore pile foundation work, including drilling, reinforcement work, and casting, is Rp306,201,760 (Three Hundred and Six Million, Two Hundred and One Thousand, Seven Hundred and Sixty Rupiah).