BOBOT PEKERJAAN BEKISTING, PEMBESIAN DAN BETON TERHADAP PEKERJAAN STRUKTUR BETON BERTULANG PADA PEMBANGUNAN SEKOLAH SD
Keywords:
reinforcement, formwork, concrete, cost and weightAbstract
In this structural work there are several work items including reinforcement, reinforcement and concrete work. Of the three work items are the main work on the construction of the building structure, therefore to find out the cost and percentage of the weight of each of these jobs. to find out the weight of each job that affects the cost and time of work issued by the contractor. In writing this thesis report, the study aims to obtain an analysis of the weight of formwork, reinforcement and concrete work on reinforced concrete structure work. The study began by conducting a survey of 4 school construction projects, namely SD 10 Sumerta, SD 14 Dauh Puri, SD 6 Sesetan, and SD 5 Ubung. This study raised a case study in an elementary school construction project in the Denpasar area. In this study, the data needed were obtained from observations, direct interviews in the field and surveys of the prices of materials used, and there was also data obtained from contractors including working drawings. The research conducted in this thesis is a quantitative descriptive study by comparing 4 construction projects. Based on the analysis and discussion that has been done, the results of each job were obtained. Reinforcement work is Rp. 502,180,642.46, formwork work is Rp. 248,593,891.44 and for concrete work is Rp. 237,879,115. while the weight of each structural work consists of 50.01% reinforcement work, 25.58% formwork and 24.41% concrete work