PERHITUNGAN PENGENDALIAN BAHAN DAN TENAGA KERJA PEKERJAAN STRUKTUR PROYEK PEMBANGUNAN VILLA 2 BEDROOM ECHO BEACH CANGGU

Authors

  • Grecia Keke Njuah Ujung Politeknik Negeri Bali
  • I Made Budiadi, S.T.,M.T Politeknik Negeri Bali
  • I G A Putu Dewi Paramita Politeknik Negeri Bali

Keywords:

Control, Materials and Labor, Costs and Wages

Abstract

Abstract The writing of this final project aims to calculate the estimated Material Needs, Labor and costs related to the construction project of Villa 2 Bedroom Echo Beach Canggu in the Canggu area, North Kuta District, Badung Regency, Bali. The writing of this final project starts from collecting primary and secondary data, then continues by calculating the volume of each work item, after knowing the amount of different work volumes, then continuing with the calculation of the amount of labor and materials needed and then calculating the cost of wages and materials. From the results of the calculations that have been carried out by the workforce in structural work there are 90.86 people, the need for D13 Iron material in structural work is 300,997.13 kg, the need for D8 Iron material in structural work is 47033.41 kg, the need for D10 Iron material in structural work is 17.52 kg, the need for D16 Iron material in structural work is 102776.47 kg, the need for sand material for structural work is 0.71 m3, the need for plywood material for structural work is 13.86 m2. The cost of structural work required is Rp 444.335.243 while the wage cost is Rp 124.568.500,00 and the cost of materials is 347.961.094,48.

Published

2024-12-30