PENGARUH BIAYA PENERAPAN SMK3 TERHADAP KINERJA KESELAMATAN DAN KESEHATAN KERJA PADA PROYEK PASAR UMUM GIANYAR

Authors

  • Gede Putu Bagus Artha Dana Politeknik Negeri Bali
  • I Made Anom Santiana Politeknik Negeri Bali
  • A.A. Ngurah Roy Sumardika Politeknik Negeri Bali

Keywords:

The cost of implementing SMK3, and K3 performance

Abstract

The Gianyar Public Market building project is a project that has 7 floors, and
has many opportunities for work accidents. With the high risk in the project construction,
K3 being a new thing that must be considered to avoid and prevent accidents at the project
site. The purpose of this study was to determine the magnitude cost of implementation of
SMK3 and to determine the effect of implementing SMK3 cost on the implementation safety
and health performance on the Gianyar Public Market project. The method of this
research is by distributing it to 30 worker respondents and has 10 statements on cost
implementation and 10 statements on implementation performance and analized with
simple linear regression analysis. The results of this study indicate that the cost of
implementing SMK3 is 0.0036% of the project contract value and the equation obtained
from the relationship between the costs of implementing and implementing performance
safety and health is and the correlation rate is 70.3%.

Downloads

Published

2021-12-31